Порівняти коміти

...
Автор SHA1 Повідомлення Дата
l0ng-ai 57acc4617b ci: split E2E into two parallel shards
The E2E job reached its 30-minute limit before finishing (453 of 491 tests, none failed), so whole runs were cancelled. Two Playwright shards (about 250 tests each) run in parallel, each with its own report artifact.

Fixes #3605
2026-11-16 09:23:41 +08:00
+7 -3
Переглянути файл
@@ -208,11 +208,15 @@ jobs:
- run: pnpm build
e2e:
name: E2E
name: E2E (${{ matrix.shard }}/2)
needs: changes
if: needs.changes.outputs.frontend == 'true'
timeout-minutes: 30
runs-on: ubuntu-24.04
strategy:
fail-fast: false
matrix:
shard: [1, 2]
# Browsers and their system libraries are preinstalled; keep the tag in step with @playwright/test.
container: mcr.microsoft.com/playwright:v1.64.1-noble
steps:
@@ -222,12 +226,12 @@ jobs:
- uses: actions/setup-node@v5
with: { node-version: 22, cache: pnpm }
- run: pnpm install --frozen-lockfile
- run: pnpm e2e
- run: pnpm e2e --shard=${{ matrix.shard }}/2
env:
HOME: /root
- uses: actions/upload-artifact@v6
if: failure()
with:
name: playwright-report
name: playwright-report-${{ matrix.shard }}
path: playwright-report/
retention-days: 7